tunnel excavation and support
基本解释
- [交通运输工程]隧道开挖与支护
英汉例句
- ANSYS software simulation of the arch tunnel excavation and support structures of the finite element method were researched.
对ANSYS软件模拟连拱隧道开挖及支护结构的有限元理论进行了研究。
lib.swpu.edu.cn - The fault and crush zone is the very difficult and catastrophic sector of the tunnel during the course of excavation and support.
断层及其破碎带是隧道开挖支护施工中难度很大、容易出现事故的地段。 - In the model test study with scale ratio of 1∶10, the simulation of model stratum, excavation scheme and tunnel support scheme are introduced; and the station construction process is reappeared.
通过1∶10大比尺模型试验研究,介绍模型地层、开挖方案和支护方案的模拟,比较真实地再现新型车站的施工过程。
202.127.156.16
双语例句
专业释义
- 隧道开挖与支护