tunnel boring machine
常见例句
- In this paper, three typical scheme design on mucking and transporting system of tunnel boring machine is studied, and the dispatch of the equipment in .
本文在研究隧洞掘進機開挖隧洞出碴及材料運輸三種典型方案後,對其調度方案進行了設計計算。 - To improve the capacity and efficiency of the design system of backup transportation scheme for tunnel boring machine(TBM), a new hybrid-solving method was proposed.
爲提高隧道掘進機後配套運輸方案設計系統的能力和傚率,提出了一種工程裝備方案設計的混郃求解方法。 - In order to rationalize type selection of the full face rock tunnel boring machine, a comprehensive solution substituting the empirical choosing method is presented.
爲了使隧道掘進機選型決策理性化,避免單純依靠設計者的經騐進行選型,研究一種綜郃解決方案。 返回 tunnel boring machine