Ertan
基本解释
- 埃爾坦
英汉例句
- Ertan hydropower station is the first power station built on Yalong River.
摘要二灘水電站是雅礱江梯級開發的第一個水電站。 - In July 1991,the seismic telemetered network of Ertan reservoir was set up.
1991年7月建成投測的二灘水庫地震遙測台網,經過7年的連續運行,爲我們提供了寶貴的第一手資料。 - Nowadays China applied it only in some big water conservancy projects, for example Ertan hydropower station.
目前我國僅是在一些大型水利工程中有所應用,例如二灘水電站永久機電設備的物流琯理等。 - This article reviews the choice of air cooling mode of hydrogenerator for Ertan hydropower station.
摘要廻顧了二灘水電站水輪發電機空冷方式的選擇; - The surface outlets at Ertan hydropower plant are arc gates,and the hoisting devices are duplex hydraulic hoists.
二灘電廠表孔採用弧形門,啓閉形式爲雙缸液壓啓閉機。